2015 Proposed Construction Projects in Southeast Eugene


Take a look at the proposed Public Works construction projects for parks, stormwater and transportation improvements in our neighborhood!

2015 Proposed Construction Projects

  • 1: Amazon Park Renovation
  • 3: Spencer Butte Summit Trail
  • 8: 25th Ave: Hawkins Ln – Brittany St; City View St: 28th Ave – 29th Ave; Timberline Dr: Warren St to Wintercreek Dr Paving
  • 9: 39th Ave: Willamette St – Brae Burn Dr; 40th Ave: Donald St to Hilyard St; Brae Burn Dr: 39th Ave to Willamette St; Donald St: 32nd Ave – 40th Ave Paving
  • 11: 2015 Bicycle and Pedestrian Improvements
  • 15: 2015 Local Street Repairs and Slurry Seals
  • 17: South Willamette Street Pilot Project
  • 21: Storm Structure Improvements

Download PDF